        1. 家用電梯安裝前需要做哪些準備工作?

            首先要強調進入施工現場的施工人員要堅持文明施工、安全第一的原則。為絕對保證設備和電梯安裝人員的安全,家用電梯安裝達到安裝標準

            First of all, we must emphasize that the construction personnel entering the construction site must adhere to the principles of civilized construction and safety first. In order to absolutely guarantee the safety of equipment and elevator installers, the installation of home elevators meets the installation standards

            一、家用電梯電梯安裝前的一般要求General requirements before installation of home elevator


            首先要強調進入施工現場的施工人員要堅持文明施工、安全第一的原則。為絕對保證設備和電梯安裝人員的安全,電梯安裝達到安裝標準。

            First of all, we must emphasize that the construction personnel entering the construction site must adhere to the principles of civilized construction and safety first. In order to absolutely guarantee the safety of equipment and elevator installers, the elevator installation meets the installation standards


            在電梯安裝過程中,必須自始至終樹立安全安裝的理念,建立一套安全責任制。

            In the elevator installation process, the concept of safe installation must be established from beginning to end, and a safety responsibility system must be established.


            電梯安裝隊長或者現場主管就是電梯安裝現場的第一負責人,監管者電梯安裝所有人員和電梯設備的安全,嚴格要求電梯安裝的施工進度,以及電梯安裝的質量。

            The elevator installation team leader or site supervisor is the first person in charge of the elevator installation site. The supervisor of the safety of all elevator installation personnel and elevator equipment strictly requires the construction progress of the elevator installation and the quality of the elevator installation.


            在主管負責電梯安裝安全檢查的時候,一旦發現電梯安裝人員,有著任何的違紀違規行為,應該立即制止這樣的違規作業,及時作出整改,作到防患于未然。

            When the supervisor is responsible for the safety inspection of elevator installation, once the elevator installers are found to have any violations of discipline and regulations, they should immediately stop such illegal operations and make timely corrections to prevent problems before they occur.


            電梯安裝前需要做哪些準備工作?What preparations need to be done before elevator installation?


            二、安裝前項目準備Project preparation before installation


            在電梯安裝過程當中,使用的臨時電線,一定要有著良好的絕緣性,中間不能夠出現任何的接頭情況。

            In the elevator installation process, the temporary wires used must have good insulation, and no joints can appear in the middle.


            臨時的用電,一定要設置一個獨立的電源開關箱(里面應該包含著電源開關,照明燈的開關,漏電,短路,過載的保護裝置。)

            For temporary use of electricity, an independent power switch box must be set up (the power switch, lighting switch, leakage, short circuit, and overload protection devices should be included.)


            電線不能隨地放置,胡亂拉扯,防止出現磨損,造成絕緣層出現破損,應該沿著墻壁掛在墻壁上面。

            Wires should not be placed anywhere, pulled randomly to prevent abrasion and damage to the insulation layer, and should be hung on the wall along the wall.


            在同時施工幾個井道的時候,每個電梯井道都應該具有單獨的供電設施,有獨立的操作開關,電源送到機房和施工現場,來保證施工用電的安全。

            When several hoistways are being constructed at the same time, each elevator hoistway should have a separate power supply facility with independent operation switches, and the power supply should be sent to the machine room and construction site to ensure the safety of construction electricity.


            還應該在電梯機房,井道的頂部,井道的底部,都必須安裝一個照明用的燈,來保證照明安全。

            It is also necessary to install a lighting lamp in the elevator machine room, the top of the hoistway, and the bottom of the hoistway to ensure lighting safety.